Overview
Size of Project
5,500 SF
Location
Gulfport, MS
Role
General Contractor
Market
Healthcare
Owner
Memorial Hospital at Gulfport
Architect
Eley Guild Hardy Architects | Blitch Knevel Architects
Highlights
The scope of work consisted of renovating approximately 5,500 SF of the existing first floor of Memorial Hospital at Gulfport to house the Pre/Post Procedure Unit, as well as relocating an existing women’s restroom and mechanical room. Work included new drywall partitions, medical headwalls with medical gases, installation of an owner-provided Air Handler Unit with new mechanical infrastructure, electrical, nurse call, fire alarm, fire safing, sprinklers, and finishes throughout the areas. The work takes place inside the operating hospital and requires a full site-specific infection control plan to be implemented.